Projek Menaiktaraf Jalan Tangkak-Jasin

HOME  >  PROJECTS

Projek Menaiktaraf Jalan Tangkak-Jasin, Melaka (Pakej 4 : Baba Nyonya Resort ke Seri Negeri)

The project is situated approximately 12km from Melaka Town and approximately 5km from the Ayer Keroh exit of the North-South Expressway (PLUS). Spanning a total length of approximately 5.5km along Jalan Gapam, the scope of works involves upgrading the existing roadway to a four-lane dual carriageway to meet JKR R4 standards.

Additionally, the project includes the replacement of the existing twin pipe culvert with a 4.2m x 2.4m precast box culvert, installation of L-Shape retaining walls, street lighting, traffic lights, RSD type II, and the implementation of a comprehensive drainage system featuring U-shaped drains.

Contract Value: RM35,078,136.22

Project Start Date: 1st February 2010

Completion Date: 30th January 2011

Our Client: JKR Melaka